Skip to content
FOBplans

Supplies · $10/unit · 1,800/pallet

Build supplies

Build supplies pay for every structure and every repair. Placing a blueprint deducts the menu price; each hammer strike deducts more, which is why a finished piece costs about a third more than the menu says.

Quick facts

Loose unit
$10 · 0.02 kg · stack of 50
Pallet
1,800 units · $400 · drop ≤ 90 m ‡
Large crate
1,750 units · $300 · Driver 16
Ural
2 pallets or 4 large crates
Lakota / Huey
1 pallet or 2 large crates
Starting stock in the kit
1,250
Cap per FOB
20,000

Worked example: 1,800 loose units cost $18,000, the same pallet costs $400. Loose units only make sense for the first sandbags before a FOB exists.

Guide: FOB cost, pallets, trucks and cash · How many pallets do I need?

Every structure consumes build supplies

The full cost table is on the structures page. Repairs draw from the same pool; a base under fire drains the stock even with nothing new placed.

Other supplies: Fuel supplies · Ammo supplies · Mechanical supplies