Hedgehog slalom
Four staggered hedgehogs in front of a gate: vehicles slow to walking pace, C4 carriers dismount in the open. 56 supplies, no FOB needed.
56 → ≈75 · 1 pallets · $1,250
Blueprints · Hedgehog slalom
8 blueprints that use or demonstrate the hedgehog slalom build type, with parts lists, costs and phases.
8 blueprints
Four staggered hedgehogs in front of a gate: vehicles slow to walking pace, C4 carriers dismount in the open. 56 supplies, no FOB needed.
56 → ≈75 · 1 pallets · $1,250
Three hedgehogs in a chevron, wire in the gaps and a sandbag position on the flank: a 72-supply chokepoint without a FOB.
72 → ≈96 · 1 pallets · $1,480
Two players, one truck: a boxed console inside a 13×13 ring with a two-gate vehicle airlock, slalom and wire. The base every logistics run starts from.
1,086 → ≈1,448 · 1 pallets · $8,020
Entry gate with airlock on the south face, exit gate on the east face, refuel and repair stations beside the lane between them: trucks drive in, service and drive out without turning.
1,398 → ≈1,864 · 2 pallets · $10,440
A 15×15 ring with vehicle airlock, two bunkers covering the far wall, a tower with kill box, a second wall layer on the threat face, hedgehogs and wire. Built to sit in the Hot Zone and stay there.
1,730 → ≈2,307 · 2 pallets · $10,510
A 19×19 ring around a map tower: two-door vestibules on both ground entrances, corner bunkers, a Talon ground box, two-high walls on the exposed faces. The tower interior is not buildable, so the lock is built outside.
2,748 → ≈3,664 · 3 pallets · $10,970
A 27×27 Bremer shell around a 17×17 HESCO ring with a four-cell vehicle lane between them, gates offset by 90°, bunkers, Talon tower, mortar pit and Stingray nest. The all-in base for a full team with ten hammers.
3,771 → ≈5,028 · 3 pallets · $11,500
A 19×19 ring with airlock, bunkers, a Talon tower, a second wall layer and three boxed drill rigs at separate edges. Fuel logistics keep the Hot Zone parked on your base.
7,400 → ≈9,867 · 6 pallets · $12,170